RWS

British High Commission Residence – St Lucia

Location: British High Commissioners Residence- St Lucia

Client: Foreign & Commonwealth Office

Value: £62,475

Construction Period: 6 weeks

Project Description:

Removal of the existing air conditioning system and the disposal of this system to an approved recovery site.

Design, supply and installation of a new air conditioning system which comprised of a 10 HP; 2-pipe heat pump VRF system to nine rooms within the residence, using a mixture of ceiling cassette and high wall units, all the associated electrics and controls and commissioning. Some minor building works and decoration were also included within this project.


Pages