British Embassy, Warsaw
Location: British Embassy, Warsaw
Client: Mace Ltd
Value: £1,750,000
Construction Period: 18 Months
Project Brief:
The two secure floors of this new build British Embassy were handed over to RWS as a shell with a view to complete the internal security fit out.
Project Description:
The supply and installation of the complete fit out works including all the Mechanical & Electrical systems. The extent of the works comprised of the following:
- The complete fit out of all partitions, floors, suspended ceilings (most having an element of security built in) all decorations and timber wall panelling and carpets.
- The installation of a low temperature hot water and chilled water distribution pipework system serving chilled beams, supply and extract ventilation ductwork, grilles and diffusers all controlled by a Building Management System.
- Installation of all hot and cold water services and waste system for the new tea point areas, toilet and shower areas
- Electrical works included all lighting, power, TV, intruder wiring, data containment and a fire alarm system