British Embassy, Warsaw

Location: British Embassy, Warsaw

Client: Mace Ltd

Value: £1,750,000

Construction Period: 18 Months

Project Brief:

The two secure floors of this new build British Embassy were handed over to RWS as a shell with a view to complete the internal security fit out.

Project Description:

The supply and installation of the complete fit out works including all the Mechanical & Electrical systems. The extent of the works comprised of the following:

  • The complete fit out of all partitions, floors, suspended ceilings (most having an element of security built in) all decorations and timber wall panelling and carpets.
  • The installation of a low temperature hot water and chilled water distribution pipework system serving chilled beams, supply and extract ventilation ductwork, grilles and diffusers all controlled by a Building Management System.
  • Installation of all hot and cold water services and waste system for the new tea point areas, toilet and shower areas
  • Electrical works included all lighting, power, TV, intruder wiring, data containment and a fire alarm system