General Refurbishment And Modernisation

Overview

RWS have undertaken many refurbishment projects from concept to completion. This has included liaising with  local government bodies, ministries, education boards and large retail groups. Our ability to provide a full turn-key service can avoid any downtime and guarantees high levels of  Health and Safety procedures.

Project background

Our client had a 2 storey building that wasn’t providing an ideal existing office environment. An option was to choose a new location but our client, due to lease arrangements, wanted to continue with the existing premises. Organisational  changes provided the opportunity to reorganise the building more effectively and utilise it in a completely new layout on a single floor. This new reconfigured layout allowed for additional meeting rooms and Director offices to be incorporated

The RWS team worked with the client to identify the best solution in relation to

  • minimising the disruption to the existing employees
  • improving the environment for maximum functionality and performance
  • minimising environmental impacts through construction activities
  • providing the fastest, most cost effective implementation process, to ensure a specification was developed that was fit for purpose
Refubishment RWS LTD,Solutions to dilapidations problems, solutions to refurbishment problems

Building work completed

Dilapidation Services, Dilapidations service, Dilapidation building services, Dilaps services, delaps services, delapidation building services, dilapidation expert, dilapidation provision, dilapidation expense, dilapidation services uk, building dilapidations, dilapidations contractor, design and build contractor

This project involved full strip down and adaption of an existing office space to include

  • new ceilings
  • new floors
  • new walls and partitions (solid to glazed)
  • reconfiguration of air conditioning, lighting and data

Project completion summary

  • The building works were estimated to take 2  weeks, the project was completed on time and to budget
  • The client was able to maintain business activities  with minimal additional disruption
  • As a consequence of RWS value engineering and subsequent construction methodology the building works were completed at approximately 30% lower costs than the clients’ original expectations
Refubishment RWS LTD,Solutions to dilapidations problems, solutions to refurbishment problems

For more information on the services we provide call Kirk Brawn or Stewart Liberatore on 01733 351136 or email rws@rwsltd.co.uk